Submit your request for an esi id nu mber here.
Meter pole installation cost.
The average cost of an underground installation is 800 including materials meter 1 installation and connecting service to the splice box.
If you are a home builder.
Call centerpoint energy at 713 207 2222 to have an electric service identifier esi id number created.
All permits required to receive service are the responsibility of the member.
Then there is the cost to the electrician to build it and install it.
1 weather proof panel with breakers.
The average cost to hire an electrician to install or repair light fixtures outlets switches or fans ranges from 141 to 419 with homeowners spending 280 on average.
For larger electrical jobs like installing wiring or replacing an electrical panel expect to pay 2 000 to 6 000.
If metallic weather head is used with pvc conduit it must have a bonding ground.
Weather head must be a minimum of 18 inches from top of the pole.
If this is for electric meter set it is not necessary if the main breakers are off.
1 4x6 post braced with 2x4s with at least 12ft to knob a 16 ft post.
Contact our customer service department here or call 1 800 342 6978 for additional details.
Get free estimates from electricians near you or check out our pricing guide.
If you are a homeowner.
A licensed electrician should install the wiring between the meter pole and the building.
1 1 1.
How deep does the trench have to be.
If you are a multi unit apartment builder.
The average cost of an overhead installation is 1 200 including labor materials connecting the wire from the transformer to the weatherhead meter 1 installation and inspection of site location and pole.
See below for our assembly guide for meter pole installation.
The trench has to be 24 inches deep for secondary and a minimum of 30 inches deep for primary services.
Then you have to pull a permit 60 get a licensed electrician to install it 100 and have it signed off by a city county inspector.
The pole must be treated and be at least a class 7 round or 6 x 6 square and have a minimum of 14 5 feet above the ground.
The square d 125 amp 16 space 24 circuit outdoor the square d 125 amp 16 space 24 circuit outdoor combination meter socket and main breaker load center is suitable for use as a combination service entrance device csed.
This unit is ansi certified and ul listed with a maximum 10 000 air.